Course Content
PSU & GATE Mechanical Engineering Master Course

Lesson 9.2: Facility Layout & Plant Location

Facility layout and plant location are critical topics in Industrial Engineering. GATE and PSU exams often test efficient arrangement of resources and optimal site selection.


🔹 1. Introduction

  • Definition:

    • Facility Layout: Arrangement of machines, equipment, and workstations for efficient workflow

    • Plant Location: Selection of geographical site for the facility to minimize costs and maximize productivity

  • Applications: Manufacturing plants, warehouses, assembly lines, service industries

  • Key Concepts: Workflow efficiency, material handling, transportation cost, accessibility


🔹 2. Facility Layout

  • Objectives:

    1. Minimize material handling cost

    2. Reduce production time

    3. Improve safety and working conditions

  • Types of Layouts:

    1. Process Layout: Machines grouped by function

    2. Product Layout: Machines arranged according to production sequence

    3. Fixed-Position Layout: Product remains stationary, resources move

    4. Cellular Layout: Machines grouped in cells for family of products

  • Techniques:

    • Systematic Layout Planning (SLP)

    • Flow diagrams and relationship charts

    • Computer-aided layout design


🔹 3. Plant Location

  • Factors Influencing Location:

    • Proximity to raw materials

    • Transportation facilities

    • Power, water, and utilities

    • Labor availability and cost

    • Government policies and incentives

  • Evaluation Methods:

    1. Factor Rating Method – Assign weights and scores to location factors

    2. Break-Even Analysis – Compare total cost at different locations

    3. Transport Method – Minimizing transportation costs

  • Objectives: Minimize total cost, maximize operational efficiency, ensure long-term sustainability


🔹 4. Solved Examples (PYQ Style)

  1. Select suitable layout type for a batch production unit

  2. Perform factor rating for three proposed plant locations

  3. Use break-even analysis to compare two plant sites

  4. Draw flow diagram for product layout and identify bottlenecks


🔹 5. Practice Exercises

  1. Identify best layout type for a small-scale industry

  2. Calculate weighted score for plant location selection

  3. Solve break-even problems for fixed and variable costs

  4. Prepare a simple facility layout diagram

  5. Compare advantages and disadvantages of different layouts


🔹 6. Summary

  • Facility Layout: Arrangement of resources to maximize workflow efficiency

  • Plant Location: Optimal site selection for cost reduction and accessibility

  • Types of Layouts: Process, Product, Fixed-position, Cellular

  • Evaluation Methods: Factor rating, Break-even, Transport

  • Exam Tip: Focus on layout selection, cost analysis, and evaluation techniques

Scroll to Top